The Pain Statement
The Dependency Logjam
Automatically visualize which blocks are ready for testing based on real-time construction and quality sign-offs.
The Signal Map Gap
Stop the manual cross-referencing of SCADA tags. Map every signal directly to its physical asset on a GIS Digital Twin.
The O&M Handover Wall
Eliminate the 30-day "data cleanup" period. Generate an audit-ready Digital Birth Certificate for every inverter, string, and tracker.

Energization Intelligence
Visualize Your Path to Power
Don't guess which power block is ready for hot commissioning. SenseHawk's Energization Heat Maps show you exactly which areas have cleared QA/QC and are safe for power injection.
Block Readiness Status
See at a glance which power blocks have completed all QA/QC sign-offs and are cleared for energization - no manual cross-checking required.
Real-Time Bottleneck Detection
Identify exactly where commissioning is stalled - whether it's a missing SCADA signal, incomplete test, or pending OEM sign-off - before it triggers Liquidated Damages.
Handover Acceleration
Compress the gap between mechanical completion and grid-tie by eliminating the manual data cleanup period with a live, audit-ready commissioning record.
Built for Utility-scale Complexity
Reduction in Commissioning cycle time
AI-Ready Intelligence
Ask Your Site: "Are We Ready to Energize?"
SenseHawk structures your testing data, making your site "AI-ready." No more searching through binders - just ask your AI Copilot for the status of any test or signal.
Try Asking
"Which inverters have passed grounding tests but are missing SCADA mapping?"
"Show me all strings where IV curve results are 5% below the design baseline."
"What is the projected date for full plant energization based on current testing speed?"

Frequently Asked Questions
How does SenseHawk accelerate COD?
Can I track IV-Curve and EL testing?
Does it support SCADA signal mapping?